Surface Treatment
Black anodize or powder coating (UV proof and bear 500 hours salt spray test)
Processing Details
Alloy melting - Extruding - Cutting - CNC machining - Deburr - Pre-treatment - Black powder coating - Assembly - Inspection and Packing
Packaging
Each pc wrapped by PE foam sheet, studs sides placed face-to-face, 3 foam blocks inside, two pcs as one set put into a box, then packed with pallet. Customized packing is also available.
Production Lead Time
Mold development & sample confirmation: 12-15 days. Production: 15-20 days after sample confirmed.
Supply Ability
30,000 pcs per Month
Payment Terms
30% deposit before production, the balance paid before loading
Port
Shenzhen or Guangzhou
Place of Origin
Guangdong, China
Certifications
ISO9001, ISO14001, ISO45001, RCV, and GRS
Frequently Asked Questions (FAQ)
What material is used for the roof rack support?
The product is manufactured using premium Aluminum alloy 6063-T5 per AA standard. Other aluminum alloys can also be provided based on your project requirements.
What surface treatment options do you offer for corrosion resistance?
We offer black anodize or high-grade powder coating. Our powder coating finishes are UV proof and designed to successfully withstand a 500-hour salt spray test for maximum durability.
Can you develop custom designs and molds?
Yes, we support complete OEM/ODM services. Custom mold development and sample confirmation typically take 12-15 days, followed by a mass production lead time of 15-20 days once the sample is approved.
What is the Minimum Order Quantity (MOQ) and production capacity?
Our standard Minimum Order Quantity (MOQ) is 300 pieces. We maintain a stable monthly supply ability of up to 30,000 pieces.
Which quality certifications does the manufacturing process hold?
Our manufacturing and processing facilities are fully certified to international standards including ISO9001, ISO14001, ISO45001, RCV, and GRS.
What are your payment and shipping terms?
We accept a 30% deposit before production, with the remaining balance paid prior to loading. Shipments are typically processed through Shenzhen or Guangzhou ports.